PARAMETER | UNIT |
Total Moisture | 12% – 14% |
Inherent Moisture | 3% – 5% |
Ash Content | 20% – 23% |
Total Sulphur | 0.40% – 0.70% |
Volatile Matter | 6% – 12% |
Fixed Carbon | 65% – 70% |
Gross Calorific Value (ARB) | 5.600 – 5.800 |
Indonesia Steam Coal, ARB 5800 – 5600
$0.00 Exclude PPn
Berat : Metric Ton
Origin : Sumatera
Commodity : STEAM COAL in bulk
Kuantitas : Minimum 5000 ton lalu hingga 50.000 ton per bulan x 12 bulan (+10%)
Surveyor : To be mutually agreed
Loading Port: East Sumatera Indonesia
Loading Rate : 8000 MT/Hari
Laycan : Exact laycan to be agreed at time of signing contract
Payment : 100% LC at sight by international prime bank upon dokuments presentatioan
Validity : Subject unsold and subject to reconfirmation by contract seller
Available on backorder