Indonesia Steam Coal, ARB 5000 – 4800

$0.00 Exclude PPn

Berat : Metric Ton
Origin : Sumatera
Commodity : STEAM COAL in bulk
Kuantitas : Minimum 5000 ton lalu hingga 50.000 ton per bulan x 12 bulan (+10%)

Surveyor : To be mutually agreed
Loading Port: East Sumatera Indonesia
Loading Rate : 8000 MT/Hari

Laycan : Exact laycan to be agreed at time of signing contract
Payment : 100% LC at sight by international prime bank upon dokuments presentatioan
Validity : Subject unsold and subject to reconfirmation by contract seller

 

Available on backorder

PARAMETER UNIT
Total Moisture 12% – 16%
Inherent Moisture 4% – 7%
Ash Content 23% – 27%
Total Sulphur 0.3% – 50%
Volatile Matter 6% – 12%
Fixed Carbon 55% – 65%
Gross Calorific Value (ARB) 4.800 – 5.000

 

ArabicChinese (Simplified)DutchEnglishFrenchGermanHindiIndonesianJapaneseKoreanPortugueseRussianSpanishVietnamese